Use-Case – ITI 71 Battery Strapping Tool Cut coil damage by 70% Removed corrosion from steel strap Reduced strapping time per coil Improved operator safety and ergonomics Payback in under 6 months Key Metrics Metric Before After
Use-Case – AKU-STEEL DUO Battery Strapping Tool Reduced strapping labor by 63% Freed one operator per shift Cut rework from damaged loads Improved strapping consistency and safety Achieved ROI in under 3 months Key Metrics Metric Before After
Use-Case – Inverter Generator 3500 watt 4500iE Cut power setup time by 70% Eliminated unsafe temporary cabling Reduced fuel use and generator hours Stopped damage to sensitive electronics Achieved payback in under 12 months Key Metrics Metric Before After
Use-Case – Rotary Arm Stretch Wrapper RA-1 Increased throughput to 30 pallets/hour Cut daily wrapping labor by 63% Reduced stretch film use by 50% Eliminated forklift queues at wrapping Payback in under 2 months Key Metrics Metric Before After
Use-Case – HIPO ULTRA Auto Strapping Machine vs AUTOMA Automatic Strapping Machine More than double strapping speed Lower labour cost per carton Fewer mis-straps and rework Brushless motor cuts downtime Fast payback under four months Key Metrics Metric Before After
Use-Case – SMITH Electric Pallet Jack With Scale SLL3C Cut pallet weighing time 60% Eliminated floor-scale bottlenecks Reduced freight claim costs 70% Improved dock throughput per shift Payback achieved in under 6 months Key Metrics Metric Before After
Use-Case – Tabletop Auto Labeling Machine T160LB Reduced labeling labor by 63% Eliminated crooked-label rework Freed staff for upstream packing Increased daily labeling capacity Payback in under 2 months Key Metrics Metric Before After
Use-Case – Extend Stainless-Steel Roller Conveyor Reduced dock handling time 40% Freed 25% dock floor space Cut damaged cartons by half Improved hygiene and washdown access Payback in under 6 months Key Metrics Metric Before After
Use-Case – ARGON PLUS Battery-Powered Strapping Tool Cut pallet strapping time by 50% Saved one full-time packaging operator Reduced transport damage claims by 60% Stabilized heavy loads up to 4200 N Payback in under four months Key Metrics Metric Before After